Since December 2024, the executive committee and volunteers have worked to determine the current state of the Masjid estate. During this the need for number of major projects has arisen, some of which are well overdue. Alhamdulillah, certain planned works have already started and masjid users are already benefiting from. These include repairing long standing issues with water temperature, the girls Madressah building cleaned and painted, boiler replacement, CCTV replacement and upgrading dated IT facilities. Find below details of refurbishment to date and planned works. Please donate generously.

Refurbishment to date

  • CCTV Installation (Masjid & Madrasah)
  • Funeral Vehicle Replacement
  • Essential Repairs & Upgrades
    • Hot water issues resolved in the main Masjid building.
    • Heating boiler replaced in the Madrasah building.
    • Outdated IT equipment upgraded.
    • Girls’ Madrasah building decorated and refurbished.

Planned Refurbishment

Refurbishment Programme Cost
Plant room repairs (leaking boiler) £1,400.00
Ground floor WC.  9 Cubicles @ £6,100 each £54,900.00
Basement Toilet Upgrades (long-term leaking issues) £24,000.00
Funeral Services Upgrade £6,300.00
External Repairs Replacement of security system, access doors, fire panel (Broken rails, walls, gates, etc) £40,050.00
Bold St Property (currently unusable and cost-bearing due to council tax) £35,000.00
IT Office systems upgrade (Upgrade systems to reduce administrative burden and build a foundation for better services) £11,000.00
 Total Cost £172,650.00